NERC CIP

NERC Critical Infrastructure Protection Reliability Standards — NERC / FERC

Also known as: CIP, NERC CIP-003, NERC CIP-015, Critical Infrastructure Protection Reliability Standards, FERC CIP

At a glance

Current version
FERC Orders No. 918 and 919 (March 2026)
Published 24 March 2026. source
Status
In force
Next deadline
None announced
Who must comply
Users, owners and operators of the Bulk-Power System in the United States (other than Alaska or Hawaii), as each CIP standard specifies. source
Written by
NERC, the Electric Reliability Organization, develops the CIP Reliability Standards; a standard or modification becomes mandatory only once FERC approves it. source source
Last change
None recorded yet

Mandatory and enforceable cybersecurity standards for the US bulk power system. A standard becomes binding only once FERC approves it, which is what makes the Federal Register the authoritative trigger rather than the NERC site.

Recent changes

No changes recorded yet — we are watching, and nothing has been published.

Key dates

No upcoming dates
  1. FERC Orders No. 918 and 919 approving virtualization standards and CIP-003-11 take effect
  2. FERC Order No. 912 takes effect, directing NERC to revise the supply chain risk management standards
  3. FERC Order No. 907 approving CIP-015-1 takes effect
  4. FERC Order No. 887 directing internal network security monitoring standards takes effect
Show 1 earlier date
  1. First mandatory CIP Reliability Standards approved by FERC take effect

Version history

  1. FERC Orders No. 918 and 919 (March 2026) RevisionCurrent

    FERC approved 11 modified CIP standards that allow virtualization, and CIP-003-11 on security controls for low impact BES Cyber Systems; both effective as orders on 26 May 2026. source

    More
    • Order No. 919 approved 11 modified CIP standards, four new and 18 revised NERC Glossary definitions, and retired the versions they replace.
    • Order No. 918 approved CIP-003-11, which builds on CIP-003-10 to reduce the risk of a coordinated attack on low impact facilities.
    • FERC directed NERC to set clear criteria for the "per system capability" exception used in the virtualization standards.
  2. CIP-015-1 internal network security monitoring (Order No. 907) Amendment

    FERC approved the new standard CIP-015-1 on internal network security monitoring and directed NERC to extend it to electronic access control or monitoring systems and physical access control systems outside the electronic security perimeter. source

  3. CIP-012-1 control center communications (Order No. 866) Amendment

    FERC approved CIP-012-1 on protecting communications between control centers. source

  4. Supply chain standards (Order No. 850) Amendment

    FERC approved CIP-013-1 on supply chain risk management, with CIP-005-6 and CIP-010-3. source

  5. CIP-003-7 (Order No. 843) Revision

    FERC approved CIP-003-7, clarifying electronic access controls and adding transient device controls for low impact BES Cyber Systems. source

Show 5 older versions
  1. Revised CIP standards (January 2016) Revision

    FERC approved seven revised standards: CIP-003-6, CIP-004-6, CIP-006-6, CIP-007-6, CIP-009-6, CIP-010-2 and CIP-011-2. source

  2. CIP-014-1 physical security (Order No. 802) Amendment

    FERC approved CIP-014-1 to strengthen physical security of the most critical Bulk-Power System facilities. source

  3. CIP Version 5 (Order No. 791) Major version

    FERC approved CIP-002-5 through CIP-011-1, adopting new controls and extending the scope of protected systems. source

  4. CIP Version 4 (Order No. 761) Revision

    FERC approved eight modified standards, CIP-002-4 through CIP-009-4. source

  5. First mandatory CIP standards (Order No. 706) Major version

    FERC approved the first eight CIP Reliability Standards; effective 7 April 2008. source

Who it applies to

Every user, owner and operator of the US Bulk-Power System must comply with the FERC-approved CIP standards that apply to it.

Mandatory
Each applicable user, owner or operator of the Bulk-Power System must comply with Commission-approved Reliability Standards developed by the Electric Reliability Organization. source
Who exactly
Each standard identifies the subset of users, owners and operators to which it applies. source
Effective versions
NERC must post the currently effective standards, as approved by FERC, with their effective dates. source
Implementation plans
FERC approves each standard together with its implementation plan and effective date, and retires the version it replaces. source

How compliance is assessed

Compliance is checked through the ERO's compliance monitoring and enforcement process, of which audits are one part.

Monitoring
FERC described compliance audits as one aspect of the ERO's compliance monitoring and enforcement process, conducted after the fact. source
Substance over paperwork
Responsible entities must comply with the substance of each requirement, not just show that a document exists. source

Enforcement and penalties

NERC and the Regional Entities determine financial penalties for violations, weighted by each requirement's risk factor.

Risk factors
Violation Risk Factors delineate the relative risk each requirement poses to the Bulk-Power System and are used by NERC and the Regional Entities to determine financial penalties. source
Penalty factors approved
FERC approves the violation risk factors and violation severity levels with each standard. source

Documents

  1. Law text 18 CFR part 40 – Mandatory Reliability Standards for the Bulk-Power System
  2. Standard NERC CIP Reliability Standards
  3. Law text FERC Order No. 919, Virtualization Reliability Standards (24 March 2026)
  4. Law text FERC Order No. 918, CIP-003-11 (24 March 2026)
  5. Law text FERC Order No. 907, CIP-015-1 internal network security monitoring (2 July 2025)

Verified against official sources on 18 October 2026. We monitor the official sources for this framework. Watching since 19 September 2026. Subscribe to NERC CIP (RSS)