NERC CIP
NERC Critical Infrastructure Protection Reliability Standards — NERC / FERC
Also known as: CIP, NERC CIP-003, NERC CIP-015, Critical Infrastructure Protection Reliability Standards, FERC CIP
Official site Official change log Subscribe to NERC CIP (RSS)
At a glance
- Status
- In force
- Next deadline
- None announced
- Who must comply
- Users, owners and operators of the Bulk-Power System in the United States (other than Alaska or Hawaii), as each CIP standard specifies. source
- How it is assessed
- Compliance is checked through the ERO's compliance monitoring and enforcement process, of which audits are one part. source
- Written by
- NERC, the Electric Reliability Organization, develops the CIP Reliability Standards; a standard or modification becomes mandatory only once FERC approves it. source source
- Enforced by
- NERC and the Regional Entities determine financial penalties for violations, weighted by each requirement's risk factor. source
- Last change
- None recorded yet
Mandatory and enforceable cybersecurity standards for the US bulk power system. A standard becomes binding only once FERC approves it, which is what makes the Federal Register the authoritative trigger rather than the NERC site.
Recent changes
No changes recorded yet — we are watching, and nothing has been published.
Key dates
No upcoming dates- FERC Orders No. 918 and 919 approving virtualization standards and CIP-003-11 take effect
- FERC Order No. 912 takes effect, directing NERC to revise the supply chain risk management standards
- FERC Order No. 907 approving CIP-015-1 takes effect
- FERC Order No. 887 directing internal network security monitoring standards takes effect
Show 1 earlier date
Version history
-
FERC Orders No. 918 and 919 (March 2026) RevisionCurrent
FERC approved 11 modified CIP standards that allow virtualization, and CIP-003-11 on security controls for low impact BES Cyber Systems; both effective as orders on 26 May 2026. source
More
- Order No. 919 approved 11 modified CIP standards, four new and 18 revised NERC Glossary definitions, and retired the versions they replace.
- Order No. 918 approved CIP-003-11, which builds on CIP-003-10 to reduce the risk of a coordinated attack on low impact facilities.
- FERC directed NERC to set clear criteria for the "per system capability" exception used in the virtualization standards.
-
CIP-015-1 internal network security monitoring (Order No. 907) Amendment
FERC approved the new standard CIP-015-1 on internal network security monitoring and directed NERC to extend it to electronic access control or monitoring systems and physical access control systems outside the electronic security perimeter. source
-
CIP-012-1 control center communications (Order No. 866) Amendment
FERC approved CIP-012-1 on protecting communications between control centers. source
-
Supply chain standards (Order No. 850) Amendment
FERC approved CIP-013-1 on supply chain risk management, with CIP-005-6 and CIP-010-3. source
-
CIP-003-7 (Order No. 843) Revision
FERC approved CIP-003-7, clarifying electronic access controls and adding transient device controls for low impact BES Cyber Systems. source
Show 5 older versions
-
Revised CIP standards (January 2016) Revision
FERC approved seven revised standards: CIP-003-6, CIP-004-6, CIP-006-6, CIP-007-6, CIP-009-6, CIP-010-2 and CIP-011-2. source
-
CIP-014-1 physical security (Order No. 802) Amendment
FERC approved CIP-014-1 to strengthen physical security of the most critical Bulk-Power System facilities. source
-
CIP Version 5 (Order No. 791) Major version
FERC approved CIP-002-5 through CIP-011-1, adopting new controls and extending the scope of protected systems. source
-
CIP Version 4 (Order No. 761) Revision
FERC approved eight modified standards, CIP-002-4 through CIP-009-4. source
-
First mandatory CIP standards (Order No. 706) Major version
FERC approved the first eight CIP Reliability Standards; effective 7 April 2008. source
Who it applies to
Every user, owner and operator of the US Bulk-Power System must comply with the FERC-approved CIP standards that apply to it.
- Mandatory
- Each applicable user, owner or operator of the Bulk-Power System must comply with Commission-approved Reliability Standards developed by the Electric Reliability Organization. source
- Who exactly
- Each standard identifies the subset of users, owners and operators to which it applies. source
- Effective versions
- NERC must post the currently effective standards, as approved by FERC, with their effective dates. source
- Implementation plans
- FERC approves each standard together with its implementation plan and effective date, and retires the version it replaces. source
How compliance is assessed
Compliance is checked through the ERO's compliance monitoring and enforcement process, of which audits are one part.
Enforcement and penalties
NERC and the Regional Entities determine financial penalties for violations, weighted by each requirement's risk factor.
- Risk factors
- Violation Risk Factors delineate the relative risk each requirement poses to the Bulk-Power System and are used by NERC and the Regional Entities to determine financial penalties. source
- Penalty factors approved
- FERC approves the violation risk factors and violation severity levels with each standard. source
Documents
- Law text 18 CFR part 40 – Mandatory Reliability Standards for the Bulk-Power System
- Standard NERC CIP Reliability Standards
- Law text FERC Order No. 919, Virtualization Reliability Standards (24 March 2026)
- Law text FERC Order No. 918, CIP-003-11 (24 March 2026)
- Law text FERC Order No. 907, CIP-015-1 internal network security monitoring (2 July 2025)
Verified against official sources on 18 October 2026. We monitor the official sources for this framework. Watching since 19 September 2026. Subscribe to NERC CIP (RSS)